SERVER-139482Needs Scheduling
Add optimal DoP to parallel plan
As of the writing of this ticket, the parallel planner produces a plan to hand off to lowering/SBE and the runtime greedily uses up to maxDoP threads assuming the system is not overloaded. This ticket tracks to improve the interaction such that QO utilizes the estimated scanned data as an indicator of _how_ parallel a plan should be.