SERVER-139482Needs Scheduling

Add optimal DoP to parallel plan

As of the writing of this ticket, the parallel planner produces a plan to hand off to lowering/SBE and the runtime greedily uses up to maxDoP threads assuming the system is not overloaded. This ticket tracks to improve the interaction such that QO utilizes the estimated scanned data as an indicator of _how_ parallel a plan should be.

Affected Versions
Versions known to exhibit this issue

No affected versions recorded.

Fixed Versions
Versions that include the fix

No fix available yet.

Components
Server components related to this issue

No components specified.

Labels
Tags and classification
M3PQm3