SERVER-138059ClosedWon't Do

Test for deadlocks around the critical section with concurrent reshardings

Several operations can enter their critical sections at the same time, on shards that play different roles for each of them. Waiting between the operations must not form a cycle. Scenarios: * drive N operations into their critical sections together, both through the commit monitor and through manual commitReshardCollection * crossed roles: shard S1 is a donor for A and a recipient for B, and shard S2 is the reverse; both operations enter the critical section at the same time * one operation is

Affected Versions
Versions known to exhibit this issue

No affected versions recorded.

Fixed Versions
Versions that include the fix

No fix available yet.

Components
Server components related to this issue

No components specified.

Labels
Tags and classification

No labels assigned.