SERVER-138059ClosedWon't Do
Test for deadlocks around the critical section with concurrent reshardings
Several operations can enter their critical sections at the same time, on shards that play different roles for each of them. Waiting between the operations must not form a cycle. Scenarios: * drive N operations into their critical sections together, both through the commit monitor and through manual commitReshardCollection * crossed roles: shard S1 is a donor for A and a recipient for B, and shard S2 is the reverse; both operations enter the critical section at the same time * one operation is